I think that everybody must accept that a curator's time has many calls on it and if a curators work load is to be increased (30 minutes talking to diggers X 8 projects is half a days work) then there has to be a reduction in the other duties.
I think part of the problem lies in that immediately post PPG16 there was relatively little development and a time consumming system was evolved. Is it neccessary for a curator to go to every evaluation or watching brief to check on what has been found?
Peter
I think part of the problem lies in that immediately post PPG16 there was relatively little development and a time consumming system was evolved. Is it neccessary for a curator to go to every evaluation or watching brief to check on what has been found?