29th March 2011, 12:56 PM
Sith Wrote:................. An example of how thing could be done better comes from the Radioactive Fallout and Fieldwork thread. If the archaeological contractor concerned had instantly put in an early warning of a claim for delay leading to unproductive time when the farmer dumped junk all over their site, the principal contractor would have had the whole thing sorted out in double-quick time.
It was. There was no delay for us, the point was to highlight the attitude of the farmers.
An interesting comment based on the limited information.
You seem to have the wrong end of the wrong stick.