12th June 2012, 12:46 PM
Dinosaur Wrote:Don't try and claim you've not had drivers who've never area-stripped topsoil before and spend your entire site learning! Although to be fair the construction industry probably doesn't have a lot of use for areas stripped to billiard-table quality without a bit of smoothing-out with the back of the bucket..... :face-crying:
Yep, but where possible those drivers should be sent back to the 'yard' and another driver be requested?