18th October 2013, 11:52 AM
Unitof1 Wrote:that's why all environmental sample processing should be done on site and should be part of site based costs and time even if it means taking water and tanks to site.
Well, as a very long time lurker here I was not expecting that response.
The costs for environmental sampling should indeed be included in the cost for every job, as should the cost for providing toilet facilities, but I doubt many units lug their own toilets to and from every evaluation.