Dinosaur Wrote:You're old fashioned if you still cling to the belief that most research designs continue to have any validity once the topsoil's off and you can see what's actually on the site. The research design may waffle on about sampling 18th century ditches, but I'm afraid that given the choice I'll be filling the tubs with the Neolithic pit fills and argue the toss later - no one's complained yetwell if your wsi didnt include sampling every prehistoric feature that turned up it would have to be written by an idiot and approved by an idiot but thats not the point. you can fill your tubs with whatever you like so long as you answer the questions in the research design. my guess would be that if you havent properly costed the project if you dont