4th March 2009, 04:57 PM
I doubt a measly ?2bn would be enough to fund the architects of the third runway to have fresh cravats to the end of the project. The new rail link that goes with the expanded Heathrow is projected to cost ?4.5 - 6bn alone. :face-confused: