4th September 2005, 06:37 PM
1man1desk said (lucky git by the way to have a desk all to himself)
err call me naive, but dont we all do this already?? I generally have a method statement/risk assessment etc included with the tender document to meet any contract spec, which i thought was pretty much mandatory otherwise the insurance is probably buggered and the client won't allow us on site. In any case H&S site inductions, either our own or the clients, are mandatory.
Then i only have my own personal stupidity to deal with, such as almost mattocking my own leg off....
Quote:quote:One way to add an extra control to prevent this kind of dangerous practice is to build good H&S into specs/contracts.
err call me naive, but dont we all do this already?? I generally have a method statement/risk assessment etc included with the tender document to meet any contract spec, which i thought was pretty much mandatory otherwise the insurance is probably buggered and the client won't allow us on site. In any case H&S site inductions, either our own or the clients, are mandatory.
Then i only have my own personal stupidity to deal with, such as almost mattocking my own leg off....